Skip to content
Thursday, November 19, 2026 · Riyadh
العربيةNewsletterContact
Saudi Arabia

Al-Baha Municipality boosts readiness for heavy rainfall

Al-Baha Municipality has expanded its rainwater drainage networks by 62%, now exceeding 680 km, as part of efforts to improve infrastructure and reduce flooding.

Ajel News10 min ago · 1 min read
Al-Baha Municipality rainwater drainage infrastructure

Key Takeaways

AI

Al-Baha Municipality has expanded its rainwater and flood drainage networks, which now exceed 680 kilometers in length—a 62% increase—as part of infrastructure projects aimed at enhancing readiness and reducing rainwater accumulation.

The municipality has also raised its field preparedness to deal with the current rainy conditions in the region by activating emergency plans, increasing readiness across its affiliated municipalities, and intensifying field monitoring of roads, public squares, culverts, rainwater catchments, as well as 39 support sites. More than 500 engineering and technical personnel, over 250 pieces of equipment and machinery, and more than 300 smart sensors have been deployed to boost response efficiency and minimize the risks of water accumulation and flooding.

These efforts are part of ongoing field initiatives by the municipality to develop infrastructure according to planning and implementation standards that promote sustainability, support the efficiency of service networks, and enhance safety and readiness in Al-Baha city.

The municipality has urged citizens and residents to exercise caution during rainfall, avoid flood paths and water accumulation sites, and report any municipal concerns through official communication channels.