Skip to content
Sunday, November 15, 2026 · Riyadh
العربيةNewsletterContact
Saudi Arabia

Construction begins on Expo station for Riyadh Metro network

Riyadh Royal Commission announces start of Expo station construction, unveiling its design as part of efforts to expand public transport ahead of Expo 2030.

Ajel News37 min ago · 2 min read
Expo station construction site for Riyadh Metro network

Key Takeaways

AI

The Royal Commission for Riyadh City has announced the start of construction on the Expo station, part of the Riyadh Metro network, alongside the unveiling of its architectural design. The project is part of the commission’s efforts to enhance the city’s transport network and accommodate Riyadh’s population, urban, and economic growth, as well as to support infrastructure for hosting Expo 2030 Riyadh.

The station will facilitate visitor access to the exhibition via the public transport system and will become a permanent addition to the Riyadh Metro network. It aims to strengthen the integration of public transport and meet the city’s future urban expansion needs, continuing to serve the surrounding area and destinations after the event concludes.

Located on the Yellow Line of the Riyadh Metro, which connects to King Khalid International Airport, the station will span King Salman Road within a green corridor linking the Expo 2030 Riyadh site in the east to future urban development zones in the west.

The station will cover a total area of approximately 70,000 square meters, with a capacity to accommodate up to 19,000 users per hour.

Its architectural design draws inspiration from Riyadh’s natural environment, particularly its valleys and acacia trees. The station will feature a steel dome with a diameter of 134 meters, supported by eight branching columns that resemble acacia trees, providing shaded areas for visitors.

The station will include around 44,000 square meters of green spaces, and solar energy systems will supply about 25% of its energy needs.

The commission is implementing the station according to a schedule aligned with the development of the Expo site, ensuring completion in time for the event’s opening.

Project works are being carried out under a traffic management plan coordinated with relevant authorities, including the provision of alternative routes to minimize the impact on traffic flow and nearby residential areas, ensuring smooth movement and easy access to the area during construction.